RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2808031442 - Archived data from Wed, 07. October 2020 12:19:11 CEST


This is all the information about APD 2808031442. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2808031442
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2808031442/2319025807
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.3 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 88
Position in Box: 26
EP1 batch: 77
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5150844 V     T = -25 °C: 347.1594302 V
Voltage for Gain 150: T = +20 °C: 390.3532295 V     T = -25 °C: 354.5672353 V
Voltage for Gain 200: T = +20 °C: 394.7022453 V     T = -25 °C: 358.7026319 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.426479976 V-1     T = -25 °C: 4.84865187 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.697863706 V-1     T = -25 °C: 8.950053429 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.16726742 V-1     T = -25 °C: 15.88615493 V-1
Break-through voltage: T = +20 °C: 409.7887399 V     T = -25 °C: 373.7619646 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:40 CET jreher Updated box and position via API.
03. Feb 2021 18:25:09 CET jreher Updated box and position via API.
07. Oct 2020 12:19:11 CEST jreher Assigned to capsule by script
17. Aug 2020 15:54:07 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:28 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:27 CET jreher Updated APD location via API.
25. Nov 2019 17:17:55 CET jreher Updated box and position via API.
13. Sep 2019 10:30:23 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:49:28 CEST markus.moritz
25. Jul 2019 12:11:10 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:57 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:39 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:57 CEST Tobias Imported from Hamamatsu datasheet.