RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2808031430 - Archived data from Wed, 03. February 2021 18:25:08 CET


This is all the information about APD 2808031430. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2808031430
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2704030265/2808031430
Unit: #1655 (barcode 1309017355)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 88
Position in Box: 14
EP1 batch: 77
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6490127 V     T = -25 °C: 346.9793017 V
Voltage for Gain 150: T = +20 °C: 390.4653171 V     T = -25 °C: 354.3780297 V
Voltage for Gain 200: T = +20 °C: 394.7959273 V     T = -25 °C: 358.528917 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.407716831 V-1     T = -25 °C: 4.911524251 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.59855495 V-1     T = -25 °C: 9.126130308 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.98274018 V-1     T = -25 °C: 16.22249425 V-1
Break-through voltage: T = +20 °C: 408.0440454 V     T = -25 °C: 372.9204055 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:39 CET jreher Updated box and position via API.
03. Feb 2021 18:25:08 CET jreher Updated box and position via API.
29. Jan 2021 10:24:35 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:13 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:26 CET jreher Updated APD location via API.
25. Nov 2019 17:17:54 CET jreher Updated box and position via API.
13. Sep 2019 10:30:22 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:20:21 CEST markus.moritz
25. Jul 2019 12:11:09 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:38 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:57 CEST Tobias Imported from Hamamatsu datasheet.