RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2806031241 - Archived data from Fri, 05. February 2021 10:53:50 CET


This is all the information about APD 2806031241. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2806031241
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.3 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 44
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.9189058 V     T = -25 °C: 350.0547443 V
Voltage for Gain 150: T = +20 °C: 393.760867 V     T = -25 °C: 357.5148845 V
Voltage for Gain 200: T = +20 °C: 398.1158622 V     T = -25 °C: 361.7168217 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.516170765 V-1     T = -25 °C: 4.722646826 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.715177667 V-1     T = -25 °C: 9.313662982 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.82967681 V-1     T = -25 °C: 16.19871052 V-1
Break-through voltage: T = +20 °C: 413.0082282 V     T = -25 °C: 376.5226345 V
   
Notes: foam


Version history

Time Author Change comment
14. Apr 2021 14:20:32 CEST jreher Assigned to capsule by script
22. Feb 2021 11:10:48 CET jreher Updated box and position via API.
16. Feb 2021 12:28:30 CET jreher Updated box and position via API.
05. Feb 2021 10:53:50 CET jreher Updated box and position via API.
03. Feb 2021 18:19:38 CET jreher Updated box and position via API.
11. Aug 2020 17:26:50 CEST jreher Updated APD characteristics via API.
04. Aug 2020 15:48:18 CEST jreher Updated box and position via API.
27. Nov 2019 19:36:48 CET jreher Updated APD location via API.
25. Nov 2019 17:17:47 CET jreher Updated box and position via API.
25. Nov 2019 17:14:24 CET jreher Updated box and position via API.
04. Jul 2019 11:11:35 CEST jreher Updated APD location via API.
13. Jun 2019 10:01:11 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:36 CET Tobias Corrected dark current unit.
21. Aug 2018 11:04:05 CEST markus.moritz
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:06:00 CEST Tobias Imported from Hamamatsu datasheet.