Show Hamamatsu Avalanche Photo Diode 2806031231 - Archived data from Tue, 11. August 2020 17:27:08 CEST


This is all the information about APD 2806031231. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2806031231
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.6 V
Dark current: 9.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 46
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.7943667 V     T = -25 °C: 354.0448658 V
Voltage for Gain 150: T = +20 °C: 397.7130676 V     T = -25 °C: 361.6262714 V
Voltage for Gain 200: T = +20 °C: 402.1064727 V     T = -25 °C: 365.8843271 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.503227729 V-1     T = -25 °C: 4.632644553 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.604477167 V-1     T = -25 °C: 9.018713832 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.49489437 V-1     T = -25 °C: 15.37215275 V-1
Break-through voltage: T = +20 °C: 416.4373448 V     T = -25 °C: 380.3415014 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:54:03 CET jreher Updated box and position via API.
03. Feb 2021 18:19:50 CET jreher Updated box and position via API.
07. Oct 2020 15:46:07 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:08 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:08 CET jreher Updated APD location via API.
25. Nov 2019 17:17:47 CET jreher Updated box and position via API.
25. Nov 2019 17:14:31 CET jreher Updated box and position via API.
04. Jul 2019 11:11:51 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:40 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:36 CET Tobias Corrected dark current unit.
21. Aug 2018 11:03:11 CEST markus.moritz
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:59 CEST Tobias Imported from Hamamatsu datasheet.