RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2805031162 - Archived data from Tue, 11. August 2020 17:39:11 CEST


This is all the information about APD 2805031162. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2805031162
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2502027655/2805031162
Unit: #1115 (barcode 1309012503)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 86
Position in Box: 18
EP1 batch: 74
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0188494 V     T = -25 °C: 343.8102477 V
Voltage for Gain 150: T = +20 °C: 386.8283188 V     T = -25 °C: 351.1288148 V
Voltage for Gain 200: T = +20 °C: 391.1874502 V     T = -25 °C: 355.2340156 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.645756069 V-1     T = -25 °C: 5.058223073 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.164563652 V-1     T = -25 °C: 9.476789176 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.21745161 V-1     T = -25 °C: 14.97074284 V-1
Break-through voltage: T = +20 °C: 406.5061463 V     T = -25 °C: 369.9551592 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:26 CET jreher Updated box and position via API.
03. Feb 2021 18:24:55 CET jreher Updated box and position via API.
11. Aug 2020 17:39:11 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:59:28 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:17 CET jreher Updated box and position via API.
27. Nov 2019 19:44:05 CET jreher Updated APD location via API.
25. Nov 2019 17:17:43 CET jreher Updated box and position via API.
13. Sep 2019 10:29:39 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:36:23 CEST markus.moritz
25. Jul 2019 12:12:02 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:35 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:47 CEST Tobias Imported from Hamamatsu datasheet.