RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2804031068 - Archived data from Fri, 05. February 2021 10:59:20 CET


This is all the information about APD 2804031068. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2804031068
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.3 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 60
Position in Box: 43
EP1 batch: 73
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5741308 V     T = -25 °C: 344.4622479 V
Voltage for Gain 150: T = +20 °C: 387.4555983 V     T = -25 °C: 351.8781241 V
Voltage for Gain 200: T = +20 °C: 391.8406455 V     T = -25 °C: 356.0488033 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.419209953 V-1     T = -25 °C: 4.755887421 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.463973936 V-1     T = -25 °C: 9.473619832 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.49446201 V-1     T = -25 °C: 14.85398419 V-1
Break-through voltage: T = +20 °C: 407.4974831 V     T = -25 °C: 371.5591094 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:22:14 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:20 CET jreher Updated box and position via API.
03. Feb 2021 18:24:49 CET jreher Updated box and position via API.
11. Aug 2020 17:39:05 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:55 CET jreher Updated APD location via API.
25. Nov 2019 17:17:40 CET jreher Updated box and position via API.
13. Sep 2019 10:28:56 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:24:51 CEST markus.moritz
25. Jul 2019 12:12:16 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:35 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:34 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:34 CEST Tobias Imported from Hamamatsu datasheet.