RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2803031024 - Archived data from Wed, 03. February 2021 18:24:48 CET


This is all the information about APD 2803031024. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2803031024
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 10.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 60
Position in Box: 40
EP1 batch: 73
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6207886 V     T = -25 °C: 343.5410845 V
Voltage for Gain 150: T = +20 °C: 386.4178111 V     T = -25 °C: 350.8651862 V
Voltage for Gain 200: T = +20 °C: 390.760416 V     T = -25 °C: 354.9585114 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.46182875 V-1     T = -25 °C: 4.810612212 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.777338856 V-1     T = -25 °C: 9.88575756 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.40261863 V-1     T = -25 °C: 15.87090499 V-1
Break-through voltage: T = +20 °C: 406.1485926 V     T = -25 °C: 370.071158 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:32:16 CET oafedulidis Assigned to capsule by script
27. Aug 2021 11:15:57 CEST oafedulidis Updated box and position via API.
26. Apr 2021 15:22:13 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:18 CET jreher Updated box and position via API.
03. Feb 2021 18:24:48 CET jreher Updated box and position via API.
11. Aug 2020 17:39:03 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:54 CET jreher Updated APD location via API.
25. Nov 2019 17:17:39 CET jreher Updated box and position via API.
13. Sep 2019 10:28:55 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:19:28 CEST markus.moritz
25. Jul 2019 12:12:15 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:34 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:34 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:27 CEST Tobias Imported from Hamamatsu datasheet.