RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2802030973 - Archived data from Tue, 11. August 2020 17:38:59 CEST


This is all the information about APD 2802030973. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2802030973
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 16.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 60
Position in Box: 31
EP1 batch: 72
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.2547496 V     T = -25 °C: 346.979722 V
Voltage for Gain 150: T = +20 °C: 390.0774275 V     T = -25 °C: 354.3410772 V
Voltage for Gain 200: T = +20 °C: 394.4524009 V     T = -25 °C: 358.474913 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.530815087 V-1     T = -25 °C: 4.97908828 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.912427462 V-1     T = -25 °C: 9.194462147 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.55456318 V-1     T = -25 °C: 16.14927717 V-1
Break-through voltage: T = +20 °C: 409.2801483 V     T = -25 °C: 372.9912001 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:22:12 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:16 CET jreher Updated box and position via API.
03. Feb 2021 18:24:46 CET jreher Updated box and position via API.
11. Aug 2020 17:38:59 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:53 CET jreher Updated APD location via API.
25. Nov 2019 17:17:37 CET jreher Updated box and position via API.
13. Sep 2019 10:28:32 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:11:42 CEST markus.moritz
25. Jul 2019 12:12:29 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:33 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:20 CEST Tobias Imported from Hamamatsu datasheet.