RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2802030926 - Archived data from Tue, 11. August 2020 17:38:54 CEST


This is all the information about APD 2802030926. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2802030926
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2802030926/1911021082
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 14.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 84
Position in Box: 22
EP1 batch: 71
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.3149512 V     T = -25 °C: 346.1506177 V
Voltage for Gain 150: T = +20 °C: 389.1350199 V     T = -25 °C: 353.5263871 V
Voltage for Gain 200: T = +20 °C: 393.4939684 V     T = -25 °C: 357.6431851 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.526244299 V-1     T = -25 °C: 4.865918359 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.908110381 V-1     T = -25 °C: 9.031131638 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.57363899 V-1     T = -25 °C: 16.07032659 V-1
Break-through voltage: T = +20 °C: 408.2908478 V     T = -25 °C: 372.000711 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:10 CET jreher Updated box and position via API.
03. Feb 2021 18:24:40 CET jreher Updated box and position via API.
11. Aug 2020 17:38:54 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:35 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:10 CET jreher Updated box and position via API.
27. Nov 2019 19:43:43 CET jreher Updated APD location via API.
25. Nov 2019 17:17:34 CET jreher Updated box and position via API.
13. Sep 2019 10:28:00 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:02:07 CEST markus.moritz
25. Jul 2019 12:12:45 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:26 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:32 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:09 CEST Tobias Imported from Hamamatsu datasheet.