RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2801030890 - Archived data from Tue, 16. February 2021 12:28:44 CET


This is all the information about APD 2801030890. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2801030890
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 84
Position in Box: 12
EP1 batch: 71
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.4958257 V     T = -25 °C: 347.9777483 V
Voltage for Gain 150: T = +20 °C: 391.3263168 V     T = -25 °C: 355.3597011 V
Voltage for Gain 200: T = +20 °C: 395.6778869 V     T = -25 °C: 359.4945275 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.433520856 V-1     T = -25 °C: 4.920263419 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.715416144 V-1     T = -25 °C: 9.174203115 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.20568012 V-1     T = -25 °C: 16.30902441 V-1
Break-through voltage: T = +20 °C: 411.001929 V     T = -25 °C: 374.2423986 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:03:43 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:44 CET jreher Updated box and position via API.
05. Feb 2021 10:59:09 CET jreher Updated box and position via API.
03. Feb 2021 18:24:39 CET jreher Updated box and position via API.
11. Aug 2020 17:38:52 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:42 CET jreher Updated APD location via API.
25. Nov 2019 17:17:33 CET jreher Updated box and position via API.
13. Sep 2019 10:27:59 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:58:40 CEST markus.moritz
25. Jul 2019 12:12:45 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:25 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:31 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:04 CEST Tobias Imported from Hamamatsu datasheet.