RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2801030849 - Archived data from Tue, 11. August 2020 17:38:48 CEST


This is all the information about APD 2801030849. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2801030849
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 83
Position in Box: 41
EP1 batch: 70
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7264404 V     T = -25 °C: 345.6622694 V
Voltage for Gain 150: T = +20 °C: 388.604216 V     T = -25 °C: 353.0208936 V
Voltage for Gain 200: T = +20 °C: 392.9760595 V     T = -25 °C: 357.119108 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.679161046 V-1     T = -25 °C: 4.714272614 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.299602635 V-1     T = -25 °C: 9.55764116 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.49599348 V-1     T = -25 °C: 15.17729232 V-1
Break-through voltage: T = +20 °C: 407.4117606 V     T = -25 °C: 371.3660666 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:04 CET jreher Updated box and position via API.
03. Feb 2021 18:24:34 CET jreher Updated box and position via API.
11. Aug 2020 17:38:48 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:34 CET jreher Updated APD location via API.
25. Nov 2019 17:17:31 CET jreher Updated box and position via API.
10. Sep 2019 11:23:06 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:51:25 CEST markus.moritz
25. Jul 2019 12:13:00 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:20 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:31 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:55 CEST Tobias Imported from Hamamatsu datasheet.