RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2710030769 - Archived data from Tue, 08. December 2020 17:09:26 CET


This is all the information about APD 2710030769. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2710030769
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2313025251/2710030769
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 19.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 82
Position in Box: 34
EP1 batch: 68
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.8895076 V     T = -25 °C: 349.3543794 V
Voltage for Gain 150: T = +20 °C: 392.7710771 V     T = -25 °C: 356.8176812 V
Voltage for Gain 200: T = +20 °C: 397.1360275 V     T = -25 °C: 360.9885607 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.665702427 V-1     T = -25 °C: 4.787862393 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.260538674 V-1     T = -25 °C: 9.693501301 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53637973 V-1     T = -25 °C: 15.46057922 V-1
Break-through voltage: T = +20 °C: 412.2892366 V     T = -25 °C: 376.1769013 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:56 CET jreher Updated box and position via API.
03. Feb 2021 18:24:26 CET jreher Updated box and position via API.
08. Dec 2020 17:09:26 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:38 CEST jreher Updated box and position via API.
11. Aug 2020 17:38:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:22 CET jreher Updated APD location via API.
25. Nov 2019 17:17:25 CET jreher Updated box and position via API.
10. Sep 2019 11:22:40 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:49:39 CEST markus.moritz
25. Jul 2019 12:13:33 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:11 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:29 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:34 CEST Tobias Imported from Hamamatsu datasheet.