RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0802007367 - Archived data from Wed, 21. April 2021 13:59:47 CEST


This is all the information about APD 0802007367. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0802007367
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.9 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 190
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.6984397 V     T = -25 °C: 352.2410135 V
Voltage for Gain 150: T = +20 °C: 396.6081896 V     T = -25 °C: 359.8434945 V
Voltage for Gain 200: T = +20 °C: 400.9829582 V     T = -25 °C: 364.1212644 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.646044272 V-1     T = -25 °C: 4.678258089 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.233167133 V-1     T = -25 °C: 9.269878282 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35853974 V-1     T = -25 °C: 14.42730837 V-1
Break-through voltage: T = +20 °C: 416.1961731 V     T = -25 °C: 379.6808648 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:31:09 CET oafedulidis Assigned to capsule by script
21. Apr 2021 13:59:47 CEST jreher Updated box and position via API.
15. Apr 2021 17:00:55 CEST jreher Updated box and position via API.
05. Feb 2021 11:12:52 CET jreher Updated box and position via API.
11. Aug 2020 17:34:52 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:02:40 CET jreher Updated APD location via API.
25. Nov 2019 17:25:51 CET jreher Updated box and position via API.
16. Aug 2019 10:43:32 CEST spankonin Updated APD batch assignment via API.
13. Aug 2019 12:17:29 CEST jreher Updated APD location via API.
09. Aug 2019 17:00:10 CEST spankonin Updated APD batch assignment via API.
09. Aug 2019 14:32:24 CEST markus.moritz
22. Jun 2016 15:22:35 CEST Tobias Imported from Hamamatsu datasheet.