RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2707030563 - Archived data from Tue, 11. August 2020 17:38:09 CEST


This is all the information about APD 2707030563. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2707030563
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2313025283/2707030563
Unit: #1228 (barcode 1309011872)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 79
Position in Box: 35
EP1 batch: 64
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5998712 V     T = -25 °C: 347.1777293 V
Voltage for Gain 150: T = +20 °C: 390.4512287 V     T = -25 °C: 354.5883994 V
Voltage for Gain 200: T = +20 °C: 394.8083878 V     T = -25 °C: 358.7295273 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.429138144 V-1     T = -25 °C: 4.859555761 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.58887147 V-1     T = -25 °C: 9.912142667 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.9791127 V-1     T = -25 °C: 15.86263381 V-1
Break-through voltage: T = +20 °C: 409.7875603 V     T = -25 °C: 373.677161 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:32 CET jreher Updated box and position via API.
03. Feb 2021 18:24:02 CET jreher Updated box and position via API.
11. Aug 2020 17:38:09 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:08:43 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:05 CET jreher Updated box and position via API.
27. Nov 2019 19:42:49 CET jreher Updated APD location via API.
25. Nov 2019 17:17:11 CET jreher Updated box and position via API.
10. Sep 2019 11:20:33 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:31:43 CEST markus.moritz
25. Jul 2019 12:14:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:24 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:40 CEST Tobias Imported from Hamamatsu datasheet.