RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2707030555 - Archived data from Fri, 05. February 2021 10:58:31 CET


This is all the information about APD 2707030555. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2707030555
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 93
Position in Box: 41
EP1 batch: 63
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0817519 V     T = -25 °C: 347.4989745 V
Voltage for Gain 150: T = +20 °C: 390.9400711 V     T = -25 °C: 354.9118951 V
Voltage for Gain 200: T = +20 °C: 395.295772 V     T = -25 °C: 359.0499501 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.556764264 V-1     T = -25 °C: 4.731573461 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.031488674 V-1     T = -25 °C: 9.568415585 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.13234347 V-1     T = -25 °C: 15.2740518 V-1
Break-through voltage: T = +20 °C: 408.0910865 V     T = -25 °C: 372.2282036 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:09 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:58:31 CET jreher Updated box and position via API.
03. Feb 2021 18:24:02 CET jreher Updated box and position via API.
11. Aug 2020 17:38:08 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:49 CET jreher Updated APD location via API.
25. Nov 2019 17:17:11 CET jreher Updated box and position via API.
10. Sep 2019 11:20:33 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:30:13 CEST markus.moritz
25. Jul 2019 12:14:42 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:23 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:38 CEST Tobias Imported from Hamamatsu datasheet.