RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2707030497 - Archived data from Tue, 08. December 2020 17:09:33 CET


This is all the information about APD 2707030497. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2707030497
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2809031468/2707030497
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.6 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 79
Position in Box: 2
EP1 batch: 63
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.0946082 V     T = -25 °C: 346.7407242 V
Voltage for Gain 150: T = +20 °C: 390.020775 V     T = -25 °C: 354.1802475 V
Voltage for Gain 200: T = +20 °C: 394.4507869 V     T = -25 °C: 358.3818157 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.549610604 V-1     T = -25 °C: 4.986035471 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.832432186 V-1     T = -25 °C: 9.208418414 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.33732227 V-1     T = -25 °C: 14.35509296 V-1
Break-through voltage: T = +20 °C: 410.6138349 V     T = -25 °C: 374.1824919 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:28 CET jreher Updated box and position via API.
03. Feb 2021 18:23:58 CET jreher Updated box and position via API.
08. Dec 2020 17:09:33 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:40 CEST jreher Updated box and position via API.
11. Aug 2020 17:38:03 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:47 CET jreher Updated APD location via API.
25. Nov 2019 17:17:09 CET jreher Updated box and position via API.
10. Sep 2019 11:19:57 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:16:55 CEST markus.moritz
25. Jul 2019 12:14:39 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:45 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:22 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:23 CEST Tobias Imported from Hamamatsu datasheet.