RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2706030451 - Archived data from Wed, 03. February 2021 18:23:53 CET


This is all the information about APD 2706030451. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2706030451
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 78
Position in Box: 25
EP1 batch: 62
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5257284 V     T = -25 °C: 348.9399174 V
Voltage for Gain 150: T = +20 °C: 392.3468997 V     T = -25 °C: 356.3047631 V
Voltage for Gain 200: T = +20 °C: 396.6895405 V     T = -25 °C: 360.4386292 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.44353548 V-1     T = -25 °C: 4.952492478 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.727240464 V-1     T = -25 °C: 9.210041752 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.19833015 V-1     T = -25 °C: 16.54891451 V-1
Break-through voltage: T = +20 °C: 411.8171428 V     T = -25 °C: 375.366087 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:23 CET jreher Updated box and position via API.
03. Feb 2021 18:23:53 CET jreher Updated box and position via API.
11. Aug 2020 17:54:53 CEST jreher Updated APD location via API.
11. Aug 2020 17:38:00 CEST jreher Updated APD characteristics via API.
29. Nov 2019 11:50:23 CET jreher Updated APD location via API.
27. Nov 2019 19:42:37 CET jreher Updated APD location via API.
25. Nov 2019 17:17:06 CET jreher Updated box and position via API.
06. Sep 2019 13:13:36 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 15:01:11 CEST markus.moritz
08. Jul 2019 14:56:46 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:38 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:21 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:13 CEST Tobias Imported from Hamamatsu datasheet.