RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2705030375 - Archived data from Wed, 03. February 2021 18:23:46 CET


This is all the information about APD 2705030375. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030375
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2705030375/2505027907
Unit: #1337 (barcode 1309015047)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 77
Position in Box: 27
EP1 batch: 61
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4168317 V     T = -25 °C: 346.7419887 V
Voltage for Gain 150: T = +20 °C: 390.2713249 V     T = -25 °C: 354.1314396 V
Voltage for Gain 200: T = +20 °C: 394.6448501 V     T = -25 °C: 358.2839632 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.475037488 V-1     T = -25 °C: 5.014434217 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.712467628 V-1     T = -25 °C: 9.350141192 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.15338258 V-1     T = -25 °C: 14.65746507 V-1
Break-through voltage: T = +20 °C: 409.5868927 V     T = -25 °C: 373.3639326 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:13 CET jreher Updated box and position via API.
03. Feb 2021 18:23:46 CET jreher Updated box and position via API.
07. Oct 2020 12:12:56 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:26 CEST jreher Updated box and position via API.
11. Aug 2020 17:37:51 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:26 CET jreher Updated APD location via API.
25. Nov 2019 17:17:01 CET jreher Updated box and position via API.
06. Sep 2019 13:13:16 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:36:51 CEST markus.moritz
08. Jul 2019 14:56:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:20 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:53 CEST Tobias Imported from Hamamatsu datasheet.