RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2705030339 - Archived data from Tue, 11. August 2020 17:37:47 CEST


This is all the information about APD 2705030339. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030339
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2305024520/2705030339
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.4 V
Dark current: 12.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 76
Position in Box: 50
EP1 batch: 60
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7199374 V     T = -25 °C: 345.2078767 V
Voltage for Gain 150: T = +20 °C: 388.5886758 V     T = -25 °C: 352.6245161 V
Voltage for Gain 200: T = +20 °C: 392.9653969 V     T = -25 °C: 356.768734 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.703431973 V-1     T = -25 °C: 4.812830194 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.302997214 V-1     T = -25 °C: 9.789176504 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.47841638 V-1     T = -25 °C: 15.58391324 V-1
Break-through voltage: T = +20 °C: 408.5827679 V     T = -25 °C: 372.0746514 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:08 CET jreher Updated box and position via API.
03. Feb 2021 18:23:41 CET jreher Updated box and position via API.
11. Aug 2020 17:37:47 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:06:36 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:27 CET jreher Updated box and position via API.
27. Nov 2019 19:42:17 CET jreher Updated APD location via API.
25. Nov 2019 17:16:58 CET jreher Updated box and position via API.
06. Sep 2019 13:12:50 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:19:48 CEST markus.moritz
08. Jul 2019 14:56:11 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:24 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:18 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:40 CEST Tobias Imported from Hamamatsu datasheet.