RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2704030288 - Archived data from Wed, 07. October 2020 12:16:38 CEST


This is all the information about APD 2704030288. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2704030288
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2708030589/2704030288
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 21.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 76
Position in Box: 28
EP1 batch: 59
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2035694 V     T = -25 °C: 345.8268106 V
Voltage for Gain 150: T = +20 °C: 389.0447493 V     T = -25 °C: 353.1904613 V
Voltage for Gain 200: T = +20 °C: 393.4242357 V     T = -25 °C: 357.3401158 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.55960795 V-1     T = -25 °C: 5.027375262 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.989717686 V-1     T = -25 °C: 9.368050601 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.91643552 V-1     T = -25 °C: 14.73587068 V-1
Break-through voltage: T = +20 °C: 408.2328381 V     T = -25 °C: 371.9731799 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:06 CET jreher Updated box and position via API.
03. Feb 2021 18:23:38 CET jreher Updated box and position via API.
07. Oct 2020 12:16:38 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:16 CEST jreher Updated box and position via API.
11. Aug 2020 17:37:42 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:32:27 CET jreher Updated box and position via API.
27. Nov 2019 19:42:15 CET jreher Updated APD location via API.
25. Nov 2019 17:16:57 CET jreher Updated box and position via API.
06. Sep 2019 13:12:09 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 12:22:54 CEST markus.moritz
08. Jul 2019 14:55:56 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:22 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:18 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:34 CEST Tobias Imported from Hamamatsu datasheet.