RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2704030273 - Archived data from Mon, 15. February 2021 15:37:20 CET


This is all the information about APD 2704030273. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2704030273
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 3211035249/2704030273
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 17.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 76
Position in Box: 20
EP1 batch: 59
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.9889803 V     T = -25 °C: 346.9160753 V
Voltage for Gain 150: T = +20 °C: 389.8467206 V     T = -25 °C: 354.2652536 V
Voltage for Gain 200: T = +20 °C: 394.2241084 V     T = -25 °C: 358.3982535 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.619743939 V-1     T = -25 °C: 4.979202708 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.098745618 V-1     T = -25 °C: 9.288057626 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16253333 V-1     T = -25 °C: 14.69087323 V-1
Break-through voltage: T = +20 °C: 409.9554671 V     T = -25 °C: 373.6843305 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:01 CET jreher Updated box and position via API.
15. Feb 2021 15:37:20 CET jreher Assigned to capsule by script
05. Feb 2021 10:58:05 CET jreher Updated box and position via API.
03. Feb 2021 18:23:37 CET jreher Updated box and position via API.
11. Aug 2020 17:37:41 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:14 CET jreher Updated APD location via API.
25. Nov 2019 17:16:56 CET jreher Updated box and position via API.
06. Sep 2019 13:12:08 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 12:19:47 CEST markus.moritz
08. Jul 2019 14:55:55 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:22 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:17 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:30 CEST Tobias Imported from Hamamatsu datasheet.