RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2704030246 - Archived data from Tue, 11. August 2020 17:37:38 CEST


This is all the information about APD 2704030246. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2704030246
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2704030246/2318025649
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.6 V
Dark current: 12.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 76
Position in Box: 2
EP1 batch: 58
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.7733932 V     T = -25 °C: 349.1675873 V
Voltage for Gain 150: T = +20 °C: 392.6291133 V     T = -25 °C: 356.5826948 V
Voltage for Gain 200: T = +20 °C: 396.9785627 V     T = -25 °C: 360.7405326 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.640801052 V-1     T = -25 °C: 4.795577889 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.276765285 V-1     T = -25 °C: 9.797521993 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.55912572 V-1     T = -25 °C: 15.69661781 V-1
Break-through voltage: T = +20 °C: 412.7613689 V     T = -25 °C: 376.2905832 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:02 CET jreher Updated box and position via API.
03. Feb 2021 18:23:35 CET jreher Updated box and position via API.
11. Aug 2020 17:37:38 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:08:42 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:05 CET jreher Updated box and position via API.
27. Nov 2019 19:42:13 CET jreher Updated APD location via API.
25. Nov 2019 17:16:55 CET jreher Updated box and position via API.
06. Sep 2019 13:11:43 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 11:59:31 CEST markus.moritz
08. Jul 2019 14:55:41 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:20 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:17 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:23 CEST Tobias Imported from Hamamatsu datasheet.