RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2703030160 - Archived data from Tue, 11. August 2020 17:37:27 CEST


This is all the information about APD 2703030160. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2703030160
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 9.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 74
Position in Box: 48
EP1 batch: 56
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0504861 V     T = -25 °C: 343.9173721 V
Voltage for Gain 150: T = +20 °C: 386.8677871 V     T = -25 °C: 351.2616531 V
Voltage for Gain 200: T = +20 °C: 391.216906 V     T = -25 °C: 355.3874624 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.658214765 V-1     T = -25 °C: 5.01347371 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.256295949 V-1     T = -25 °C: 9.389505902 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48270043 V-1     T = -25 °C: 14.93318718 V-1
Break-through voltage: T = +20 °C: 407.1028479 V     T = -25 °C: 370.9220748 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:52 CET jreher Updated box and position via API.
03. Feb 2021 18:23:25 CET jreher Updated box and position via API.
07. Oct 2020 12:26:22 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:34 CEST jreher Updated box and position via API.
11. Aug 2020 17:37:27 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:34:53 CET jreher Updated box and position via API.
27. Nov 2019 19:41:54 CET jreher Updated APD location via API.
25. Nov 2019 17:16:49 CET jreher Updated box and position via API.
06. Sep 2019 13:11:21 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 11:21:31 CEST markus.moritz
08. Jul 2019 14:55:10 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:08 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:15 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:06 CEST Tobias Imported from Hamamatsu datasheet.