Show Hamamatsu Avalanche Photo Diode 2701030004 - Archived data from Mon, 25. November 2019 17:16:41 CET
This is all the information about APD 2701030004. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2701030004 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum Box 73 |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | E02 |
| Break-through voltage: | 413 V |
| Voltage for Gain 100 (T=+25°C): | 384.5 V |
| Dark current: | 6.8 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 73 |
| Position in Box: | 6 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 24. Jul 2018 |
| Sent for analysis after irradiation: | 21. Aug 2018 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 16. Aug 2018 |
| Dose used: | 30 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 17. Aug 2018 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
| Break-through voltage: | T = +20 °C: none T = -25 °C: none |
| Notes: | foam |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 10:57:40 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:23:13 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:27:06 CEST | jreher | Updated APD characteristics via API. |
| 25. Jun 2020 11:14:27 CEST | jreher | Assigned to capsule by script |
| 20. Feb 2020 13:34:41 CET | jreher | Updated box and position via API. |
| 27. Nov 2019 19:41:40 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:16:41 CET | jreher | Updated box and position via API. |
| 11. Nov 2019 16:23:51 CET | jreher | Updated APD location via API. |
| 04. Jul 2019 11:11:46 CEST | jreher | Updated APD location via API. |
| 12. Jun 2019 16:48:42 CEST | jreher | Updated APD batch assignment via API. |
| 12. Jun 2019 16:33:39 CEST | jreher | Updated APD batch assignment via API. |
| 03. Jan 2019 00:13:11 CET | Tobias | Corrected dark current unit. |
| 21. Aug 2018 10:54:33 CEST | markus.moritz | |
| 24. May 2018 14:39:23 CEST | Tobias | Updated location to "Bochum". |
| 18. May 2018 12:01:44 CEST | Tobias | Imported from Hamamatsu datasheet. |