RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2701030000 - Archived data from Wed, 03. February 2021 18:23:12 CET


This is all the information about APD 2701030000. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2701030000
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2701030000/0812008082
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 73
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.7256855 V     T = -25 °C: 348.0990602 V
Voltage for Gain 150: T = +20 °C: 391.5879851 V     T = -25 °C: 355.4972117 V
Voltage for Gain 200: T = +20 °C: 395.9627961 V     T = -25 °C: 359.6591606 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.570433344 V-1     T = -25 °C: 4.735886882 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.767674007 V-1     T = -25 °C: 9.353613358 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.90252496 V-1     T = -25 °C: 16.26324865 V-1
Break-through voltage: T = +20 °C: 411.3562523 V     T = -25 °C: 374.6367192 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:57:39 CET jreher Updated box and position via API.
03. Feb 2021 18:23:12 CET jreher Updated box and position via API.
11. Aug 2020 17:27:05 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:37 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:00 CET jreher Updated box and position via API.
27. Nov 2019 19:41:40 CET jreher Updated APD location via API.
25. Nov 2019 17:16:40 CET jreher Updated box and position via API.
11. Nov 2019 16:23:51 CET jreher Updated APD location via API.
04. Jul 2019 11:11:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:42 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:39 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:11 CET Tobias Corrected dark current unit.
21. Aug 2018 10:58:19 CEST markus.moritz
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:42 CEST Tobias Imported from Hamamatsu datasheet.