Show Hamamatsu Avalanche Photo Diode 2701029994 - Archived data from Mon, 02. September 2019 14:13:33 CEST
This is all the information about APD 2701029994. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2701029994 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum Box 72 |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | A11 |
| Break-through voltage: | 421 V |
| Voltage for Gain 100 (T=+25°C): | 393.8 V |
| Dark current: | 7 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 72 |
| Position in Box: | 46 |
| EP1 batch: | 54 |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 26. Aug 2019 |
| Sent for analysis after irradiation: | 02. Sep 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 28. Aug 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 31. Aug 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
| Break-through voltage: | T = +20 °C: none T = -25 °C: none |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 16. Nov 2022 10:56:12 CET | oafedulidis | Assigned to capsule by script |
| 16. Dec 2021 13:41:32 CET | oafedulidis | Updated box and position via API. |
| 05. Feb 2021 10:57:37 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:23:10 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:37:11 CEST | jreher | Updated APD characteristics via API. |
| 27. Nov 2019 19:41:32 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:16:39 CET | jreher | Updated box and position via API. |
| 06. Sep 2019 13:10:02 CEST | spankonin | Updated APD batch assignment via API. |
| 02. Sep 2019 14:13:33 CEST | markus.moritz | |
| 08. Jul 2019 14:54:21 CEST | spankonin | Updated APD batch assignment via API. |
| 05. Jul 2019 13:45:53 CEST | jreher | Updated APD location via API. |
| 03. Jan 2019 00:13:11 CET | Tobias | Corrected dark current unit. |
| 24. May 2018 14:39:23 CEST | Tobias | Updated location to "Bochum". |
| 18. May 2018 12:01:40 CEST | Tobias | Imported from Hamamatsu datasheet. |