RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2610029950 - Archived data from Tue, 11. August 2020 17:37:10 CEST


This is all the information about APD 2610029950. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2610029950
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2315025411/2610029950
Unit: #1175 (barcode 1309012947)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 376.2 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 72
Position in Box: 37
EP1 batch: 53
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6096928 V     T = -25 °C: 343.3715601 V
Voltage for Gain 150: T = +20 °C: 386.4354141 V     T = -25 °C: 350.7247415 V
Voltage for Gain 200: T = +20 °C: 390.7850685 V     T = -25 °C: 354.8370473 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.464323811 V-1     T = -25 °C: 4.802661567 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.628857642 V-1     T = -25 °C: 9.826570386 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.95743108 V-1     T = -25 °C: 15.68156776 V-1
Break-through voltage: T = +20 °C: 405.9748573 V     T = -25 °C: 369.8094031 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:36 CET jreher Updated box and position via API.
03. Feb 2021 18:23:09 CET jreher Updated box and position via API.
11. Aug 2020 17:37:10 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:56 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:24 CET jreher Updated box and position via API.
27. Nov 2019 19:41:31 CET jreher Updated APD location via API.
25. Nov 2019 17:16:38 CET jreher Updated box and position via API.
06. Sep 2019 13:10:02 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 14:04:57 CEST markus.moritz
08. Jul 2019 14:54:07 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:11 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:37 CEST Tobias Imported from Hamamatsu datasheet.