RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2610029907 - Archived data from Wed, 03. February 2021 18:23:06 CET


This is all the information about APD 2610029907. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2610029907
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.2 V
Dark current: 10.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 72
Position in Box: 12
EP1 batch: 52
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.065076 V     T = -25 °C: 341.2081319 V
Voltage for Gain 150: T = +20 °C: 383.8392951 V     T = -25 °C: 348.4840655 V
Voltage for Gain 200: T = +20 °C: 388.1891184 V     T = -25 °C: 352.549678 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.619383342 V-1     T = -25 °C: 4.917208171 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.140731928 V-1     T = -25 °C: 9.129762345 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.2175201 V-1     T = -25 °C: 16.37588474 V-1
Break-through voltage: T = +20 °C: 403.939606 V     T = -25 °C: 367.7847705 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:33 CET jreher Updated box and position via API.
03. Feb 2021 18:23:06 CET jreher Updated box and position via API.
11. Aug 2020 17:37:05 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:29 CET jreher Updated APD location via API.
25. Nov 2019 17:16:36 CET jreher Updated box and position via API.
06. Sep 2019 13:09:36 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 12:08:11 CEST markus.moritz
08. Jul 2019 14:53:53 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:10 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:30 CEST Tobias Imported from Hamamatsu datasheet.