RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2609029896 - Archived data from Tue, 06. October 2020 16:52:02 CEST


This is all the information about APD 2609029896. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2609029896
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.5 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 72
Position in Box: 11
EP1 batch: 52
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.4524036 V     T = -25 °C: 342.5457352 V
Voltage for Gain 150: T = +20 °C: 385.2554489 V     T = -25 °C: 349.8065717 V
Voltage for Gain 200: T = +20 °C: 389.6260247 V     T = -25 °C: 353.8642169 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.500713462 V-1     T = -25 °C: 4.830408653 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.86536806 V-1     T = -25 °C: 10.0004059 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.57918018 V-1     T = -25 °C: 16.1448269 V-1
Break-through voltage: T = +20 °C: 405.2860241 V     T = -25 °C: 368.9662923 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:33 CET jreher Updated box and position via API.
03. Feb 2021 18:23:06 CET jreher Updated box and position via API.
08. Dec 2020 17:17:23 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:02 CEST jreher Updated box and position via API.
11. Aug 2020 17:37:05 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:29 CET jreher Updated APD location via API.
25. Nov 2019 17:16:36 CET jreher Updated box and position via API.
06. Sep 2019 13:09:36 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 12:06:29 CEST markus.moritz
08. Jul 2019 14:53:53 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:10 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:30 CEST Tobias Imported from Hamamatsu datasheet.