RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2609029874 - Archived data from Wed, 03. February 2021 18:23:01 CET


This is all the information about APD 2609029874. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2609029874
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2001021503/2609029874
Unit: #1144 (barcode 1309012794)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G13
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 5 nA
   
Screening Logistics:  
Available: No
Storage Box: 71
Position in Box: 40
EP1 batch: 52
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0066987 V     T = -25 °C: 347.4765207 V
Voltage for Gain 150: T = +20 °C: 390.8786398 V     T = -25 °C: 354.9149863 V
Voltage for Gain 200: T = +20 °C: 395.2574382 V     T = -25 °C: 359.0888783 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.593297325 V-1     T = -25 °C: 4.693623914 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.047801475 V-1     T = -25 °C: 9.48572844 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08347924 V-1     T = -25 °C: 14.96628606 V-1
Break-through voltage: T = +20 °C: 410.3397691 V     T = -25 °C: 374.519662 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:29 CET jreher Updated box and position via API.
03. Feb 2021 18:23:01 CET jreher Updated box and position via API.
11. Aug 2020 17:37:01 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:10 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:10 CET jreher Updated box and position via API.
27. Nov 2019 19:41:20 CET jreher Updated APD location via API.
25. Nov 2019 17:16:33 CET jreher Updated box and position via API.
06. Sep 2019 13:09:01 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 11:39:45 CEST markus.moritz
08. Jul 2019 14:53:51 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:09 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:28 CEST Tobias Imported from Hamamatsu datasheet.