RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2609029865 - Archived data from Wed, 03. February 2021 18:23:00 CET


This is all the information about APD 2609029865. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2609029865
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2405026316/2609029865
Unit: #1400 (barcode 1309015610)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.9 V
Dark current: 6 nA
   
Screening Logistics:  
Available: No
Storage Box: 71
Position in Box: 32
EP1 batch: 51
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.9752589 V     T = -25 °C: 341.9856363 V
Voltage for Gain 150: T = +20 °C: 384.8012137 V     T = -25 °C: 349.2865617 V
Voltage for Gain 200: T = +20 °C: 389.1783952 V     T = -25 °C: 353.4111088 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.649272472 V-1     T = -25 °C: 4.991256996 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.163000497 V-1     T = -25 °C: 9.305946723 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.18583524 V-1     T = -25 °C: 14.64690925 V-1
Break-through voltage: T = +20 °C: 404.7306696 V     T = -25 °C: 368.4233817 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:28 CET jreher Updated box and position via API.
03. Feb 2021 18:23:00 CET jreher Updated box and position via API.
07. Oct 2020 12:17:39 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:46 CEST jreher Updated box and position via API.
11. Aug 2020 17:36:59 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:12 CET jreher Updated box and position via API.
27. Nov 2019 19:41:20 CET jreher Updated APD location via API.
25. Nov 2019 17:16:32 CET jreher Updated box and position via API.
06. Sep 2019 13:09:00 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 11:32:40 CEST markus.moritz
08. Jul 2019 14:53:36 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:09 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:27 CEST Tobias Imported from Hamamatsu datasheet.