RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2609029860 - Archived data from Wed, 03. February 2021 18:23:00 CET


This is all the information about APD 2609029860. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2609029860
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.8 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 71
Position in Box: 27
EP1 batch: 51
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.7411993 V     T = -25 °C: 349.9338844 V
Voltage for Gain 150: T = +20 °C: 393.5914087 V     T = -25 °C: 357.3645275 V
Voltage for Gain 200: T = +20 °C: 397.9322933 V     T = -25 °C: 361.5163937 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.688282102 V-1     T = -25 °C: 4.907992171 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.382879947 V-1     T = -25 °C: 9.089420962 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.67909407 V-1     T = -25 °C: 16.177805 V-1
Break-through voltage: T = +20 °C: 411.7838114 V     T = -25 °C: 375.4455831 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:27 CET jreher Updated box and position via API.
03. Feb 2021 18:23:00 CET jreher Updated box and position via API.
11. Aug 2020 17:36:59 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:19 CET jreher Updated APD location via API.
25. Nov 2019 17:16:32 CET jreher Updated box and position via API.
06. Sep 2019 13:09:00 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 11:27:45 CEST markus.moritz
08. Jul 2019 14:53:36 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:09 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:25 CEST Tobias Imported from Hamamatsu datasheet.