RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2609029853 - Archived data from Tue, 11. August 2020 17:36:57 CEST


This is all the information about APD 2609029853. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2609029853
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A11
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.1 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 71
Position in Box: 21
EP1 batch: 51
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.1500017 V     T = -25 °C: 351.3471561 V
Voltage for Gain 150: T = +20 °C: 395.089213 V     T = -25 °C: 358.8877413 V
Voltage for Gain 200: T = +20 °C: 399.5127026 V     T = -25 °C: 363.1194635 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.50217506 V-1     T = -25 °C: 4.713696518 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.81705291 V-1     T = -25 °C: 9.393521489 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.33280946 V-1     T = -25 °C: 14.72021017 V-1
Break-through voltage: T = +20 °C: 414.1367197 V     T = -25 °C: 377.9378246 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:26 CET jreher Updated box and position via API.
03. Feb 2021 18:22:59 CET jreher Updated box and position via API.
11. Aug 2020 17:36:57 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:19 CET jreher Updated APD location via API.
25. Nov 2019 17:16:31 CET jreher Updated box and position via API.
06. Sep 2019 13:08:19 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 10:52:17 CEST markus.moritz
08. Jul 2019 14:53:36 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:09 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:23 CEST Tobias Imported from Hamamatsu datasheet.