RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029776 - Archived data from Fri, 05. February 2021 10:57:21 CET


This is all the information about APD 2608029776. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029776
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 10.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 70
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.7742122 V     T = -25 °C: 344.4901809 V
Voltage for Gain 150: T = +20 °C: 387.5679944 V     T = -25 °C: 351.7940904 V
Voltage for Gain 200: T = +20 °C: 391.9268005 V     T = -25 °C: 355.9218461 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.544212396 V-1     T = -25 °C: 4.764079285 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.113354488 V-1     T = -25 °C: 9.86780919 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.03445674 V-1     T = -25 °C: 15.66671718 V-1
Break-through voltage: T = +20 °C: 406.785885 V     T = -25 °C: 370.601706 V
   
Notes: foam


Version history

Time Author Change comment
15. Feb 2021 15:38:17 CET jreher Assigned to capsule by script
05. Feb 2021 10:57:21 CET jreher Updated box and position via API.
03. Feb 2021 18:22:54 CET jreher Updated box and position via API.
18. Dec 2020 13:59:53 CET jreher Updated box and position via API.
11. Aug 2020 17:26:45 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:39 CET jreher Updated APD location via API.
25. Nov 2019 17:16:26 CET jreher Updated box and position via API.
25. Nov 2019 17:14:21 CET jreher Updated box and position via API.
04. Jul 2019 11:11:29 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:35 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:07 CET Tobias Corrected dark current unit.
21. Aug 2018 11:59:35 CEST markus.moritz
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:04 CEST Tobias Imported from Hamamatsu datasheet.