RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029764 - Archived data from Tue, 06. October 2020 16:52:57 CEST


This is all the information about APD 2608029764. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029764
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.7 V
Dark current: 12 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 70
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.5833011 V     T = -25 °C: 341.5205585 V
Voltage for Gain 150: T = +20 °C: 384.3611998 V     T = -25 °C: 348.8246252 V
Voltage for Gain 200: T = +20 °C: 388.728471 V     T = -25 °C: 352.9348574 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.440208606 V-1     T = -25 °C: 4.892359192 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.59303796 V-1     T = -25 °C: 9.705940393 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.48163168 V-1     T = -25 °C: 15.43296537 V-1
Break-through voltage: T = +20 °C: 404.5590111 V     T = -25 °C: 368.3360312 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:57:20 CET jreher Updated box and position via API.
03. Feb 2021 18:22:53 CET jreher Updated box and position via API.
07. Oct 2020 12:19:29 CEST jreher Assigned to capsule by script
06. Oct 2020 16:52:57 CEST jreher Updated box and position via API.
11. Aug 2020 17:26:44 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:38 CET jreher Updated APD location via API.
25. Nov 2019 17:16:25 CET jreher Updated box and position via API.
25. Nov 2019 17:14:21 CET jreher Updated box and position via API.
04. Jul 2019 11:11:28 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:38 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:35 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:06 CET Tobias Corrected dark current unit.
21. Aug 2018 11:51:32 CEST markus.moritz
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:58 CEST Tobias Imported from Hamamatsu datasheet.