RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029759 - Archived data from Fri, 05. February 2021 10:57:18 CET


This is all the information about APD 2608029759. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029759
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.3 V
Dark current: 12.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 215
Position in Box: 50
EP1 batch: 50
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.2621955 V     T = -25 °C: 341.1830964 V
Voltage for Gain 150: T = +20 °C: 384.026653 V     T = -25 °C: 348.4927758 V
Voltage for Gain 200: T = +20 °C: 388.3685071 V     T = -25 °C: 352.5928029 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.611794662 V-1     T = -25 °C: 4.911353394 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.036345718 V-1     T = -25 °C: 9.169998962 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08035307 V-1     T = -25 °C: 16.46348175 V-1
Break-through voltage: T = +20 °C: 403.8708399 V     T = -25 °C: 367.7468145 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:31 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:57:18 CET jreher Updated box and position via API.
03. Feb 2021 18:22:50 CET jreher Updated box and position via API.
11. Aug 2020 17:39:50 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:02 CET jreher Updated APD location via API.
25. Nov 2019 17:16:24 CET jreher Updated box and position via API.
17. Sep 2019 11:31:00 CEST jgrochowski Updated APD batch assignment via API.
03. Sep 2019 15:19:30 CEST markus.moritz
08. Jul 2019 14:53:21 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:06 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:55 CEST Tobias Imported from Hamamatsu datasheet.