RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029756 - Archived data from Tue, 11. August 2020 17:39:49 CEST


This is all the information about APD 2608029756. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029756
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2404026215/2608029756
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.3 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 69
Position in Box: 46
EP1 batch: 50
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.6986507 V     T = -25 °C: 342.6001653 V
Voltage for Gain 150: T = +20 °C: 385.4736448 V     T = -25 °C: 349.9112597 V
Voltage for Gain 200: T = +20 °C: 389.7969261 V     T = -25 °C: 354.0120736 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.438447003 V-1     T = -25 °C: 4.753776125 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.64438518 V-1     T = -25 °C: 9.64773635 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.97571975 V-1     T = -25 °C: 15.37885936 V-1
Break-through voltage: T = +20 °C: 404.8111283 V     T = -25 °C: 368.8639784 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:17 CET jreher Updated box and position via API.
03. Feb 2021 18:22:49 CET jreher Updated box and position via API.
11. Aug 2020 17:39:49 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:47:24 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:19 CET jreher Updated box and position via API.
27. Nov 2019 19:41:02 CET jreher Updated APD location via API.
25. Nov 2019 17:16:24 CET jreher Updated box and position via API.
17. Sep 2019 11:31:00 CEST jgrochowski Updated APD batch assignment via API.
03. Sep 2019 15:17:50 CEST markus.moritz
08. Jul 2019 14:53:20 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:06 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:54 CEST Tobias Imported from Hamamatsu datasheet.