Show Hamamatsu Avalanche Photo Diode 2608029752 - Archived data from Mon, 25. November 2019 17:16:23 CET
This is all the information about APD 2608029752. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2608029752 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum Box 69 |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | B11 |
| Break-through voltage: | 405 V |
| Voltage for Gain 100 (T=+25°C): | 376.5 V |
| Dark current: | 6.2 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 69 |
| Position in Box: | 42 |
| EP1 batch: | 50 |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 26. Aug 2019 |
| Sent for analysis after irradiation: | 02. Sep 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 28. Aug 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 31. Aug 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
| Break-through voltage: | T = +20 °C: none T = -25 °C: none |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 10:57:17 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:22:49 CET | jreher | Updated box and position via API. |
| 07. Oct 2020 12:17:42 CEST | jreher | Assigned to capsule by script |
| 17. Aug 2020 15:50:47 CEST | jreher | Updated box and position via API. |
| 11. Aug 2020 17:39:48 CEST | jreher | Updated APD characteristics via API. |
| 20. Feb 2020 13:35:12 CET | jreher | Updated box and position via API. |
| 27. Nov 2019 19:41:02 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:16:23 CET | jreher | Updated box and position via API. |
| 17. Sep 2019 11:30:59 CEST | jgrochowski | Updated APD batch assignment via API. |
| 03. Sep 2019 15:16:09 CEST | markus.moritz | |
| 08. Jul 2019 14:53:20 CEST | spankonin | Updated APD batch assignment via API. |
| 05. Jul 2019 13:45:30 CEST | jreher | Updated APD location via API. |
| 03. Jan 2019 00:13:06 CET | Tobias | Corrected dark current unit. |
| 24. May 2018 14:39:23 CEST | Tobias | Updated location to "Bochum". |
| 18. May 2018 12:00:52 CEST | Tobias | Imported from Hamamatsu datasheet. |