RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029120 - Archived data from Tue, 08. December 2020 17:17:23 CET


This is all the information about APD 2520029120. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029120
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2520029120/2417027274
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 6 nA
   
Screening Logistics:  
Available: No
Storage Box: 69
Position in Box: 27
EP1 batch: 50
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.7249495 V     T = -25 °C: 347.353072 V
Voltage for Gain 150: T = +20 °C: 390.63203 V     T = -25 °C: 354.8104606 V
Voltage for Gain 200: T = +20 °C: 395.0267974 V     T = -25 °C: 358.9899457 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.372005843 V-1     T = -25 °C: 4.777849131 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.504833655 V-1     T = -25 °C: 9.722685166 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.69370689 V-1     T = -25 °C: 15.43899357 V-1
Break-through voltage: T = +20 °C: 410.6056476 V     T = -25 °C: 374.6546523 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:15 CET jreher Updated box and position via API.
03. Feb 2021 18:22:47 CET jreher Updated box and position via API.
08. Dec 2020 17:17:23 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:02 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:46 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:01 CET jreher Updated APD location via API.
25. Nov 2019 17:16:22 CET jreher Updated box and position via API.
17. Sep 2019 11:30:58 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:41:32 CEST markus.moritz
08. Jul 2019 14:53:19 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:29 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:05 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:46 CEST Tobias Imported from Hamamatsu datasheet.