Serial: 2520029118
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.6 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 69
Position in Box: 25
EP1 batch: 49
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4778242 V     T = -25 °C: 347.0632785 V
Voltage for Gain 150: T = +20 °C: 390.3158821 V     T = -25 °C: 354.4779262 V
Voltage for Gain 200: T = +20 °C: 394.6758678 V     T = -25 °C: 358.6351416 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.469211237 V-1     T = -25 °C: 4.896674872 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.754891934 V-1     T = -25 °C: 9.060052153 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.29752018 V-1     T = -25 °C: 16.08279319 V-1
Break-through voltage: T = +20 °C: 410.2975742 V     T = -25 °C: 374.1459768 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:15 CET jreher Updated box and position via API.
03. Feb 2021 18:22:47 CET jreher Updated box and position via API.
07. Oct 2020 12:17:06 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:31 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:45 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:00 CET jreher Updated APD location via API.
25. Nov 2019 17:16:22 CET jreher Updated box and position via API.
13. Sep 2019 10:31:36 CEST jgrochowski Updated APD batch assignment via API.
29. Jul 2019 14:43:20 CEST markus.moritz
08. Jul 2019 14:53:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:28 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:05 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:46 CEST Tobias Imported from Hamamatsu datasheet.