RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2410026677 - Archived data from Tue, 11. August 2020 17:22:05 CEST


This is all the information about APD 2410026677. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2410026677
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2410026677/2410026682
Unit: #842 (barcode 1309009251)
Preamp: 4595
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 14
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9250421 V     T = -25 °C: 345.4881239 V
Voltage for Gain 150: T = +20 °C: 388.7837219 V     T = -25 °C: 352.9140673 V
Voltage for Gain 200: T = +20 °C: 393.1652065 V     T = -25 °C: 357.0860245 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.49204801 V-1     T = -25 °C: 4.948771392 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.553813407 V-1     T = -25 °C: 9.790111446 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.27546462 V-1     T = -25 °C: 15.11824048 V-1
Break-through voltage: T = +20 °C: 409.0564545 V     T = -25 °C: 372.5297095 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:34 CET jreher Updated box and position via API.
03. Feb 2021 18:15:44 CET jreher Updated box and position via API.
11. Aug 2020 17:22:05 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:38 CET jreher Updated box and position via API.
27. Nov 2019 19:31:54 CET jreher Updated APD location via API.
25. Nov 2019 17:12:00 CET jreher Updated box and position via API.
15. Jul 2019 15:46:25 CEST jreher Assigned to unit by script
15. Jul 2019 15:23:55 CEST jreher Assigned to capsule by script
04. Jul 2019 11:08:07 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:23 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:35 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:02 CET Tobias Corrected dark current unit.
26. Nov 2018 12:13:11 CET markus.moritz
16. Nov 2018 12:28:29 CET markus.moritz
12. Jan 2018 13:16:57 CET Tobias Imported from Hamamatsu datasheet.