RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2410026660 - Archived data from Wed, 07. October 2020 12:16:00 CEST


This is all the information about APD 2410026660. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2410026660
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2501027628/2410026660
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 7.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 14
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.2584451 V     T = -25 °C: 347.5600456 V
Voltage for Gain 150: T = +20 °C: 391.1006062 V     T = -25 °C: 354.9820872 V
Voltage for Gain 200: T = +20 °C: 395.4590298 V     T = -25 °C: 359.1353945 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.443692632 V-1     T = -25 °C: 4.954311692 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.348407021 V-1     T = -25 °C: 9.022212821 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35816798 V-1     T = -25 °C: 15.65106484 V-1
Break-through voltage: T = +20 °C: 410.4189401 V     T = -25 °C: 373.9377424 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:33 CET jreher Updated box and position via API.
03. Feb 2021 18:15:42 CET jreher Updated box and position via API.
07. Oct 2020 12:16:00 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:05 CEST jreher Updated box and position via API.
11. Aug 2020 17:22:02 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:52 CET jreher Updated APD location via API.
25. Nov 2019 17:11:59 CET jreher Updated box and position via API.
04. Jul 2019 11:08:06 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:27 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:22 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:34 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:01 CET Tobias Corrected dark current unit.
26. Nov 2018 12:00:55 CET markus.moritz
16. Nov 2018 13:17:50 CET markus.moritz
12. Jan 2018 13:16:56 CET Tobias Imported from Hamamatsu datasheet.