RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2409026634 - Archived data from Wed, 12. June 2019 15:03:26 CEST


This is all the information about APD 2409026634. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2409026634
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 14
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes: foam


Version history

Time Author Change comment
09. Feb 2021 11:19:20 CET jreher Assigned to capsule by script
05. Feb 2021 10:49:32 CET jreher Updated box and position via API.
03. Feb 2021 18:15:41 CET jreher Updated box and position via API.
18. Dec 2020 14:01:35 CET jreher Updated box and position via API.
11. Aug 2020 17:22:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:52 CET jreher Updated APD location via API.
25. Nov 2019 17:11:58 CET jreher Updated box and position via API.
04. Jul 2019 11:08:05 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:26 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:21 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:26 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:01 CET Tobias Corrected dark current unit.
26. Nov 2018 11:56:34 CET markus.moritz
16. Nov 2018 13:20:28 CET markus.moritz
12. Jan 2018 13:16:56 CET Tobias Imported from Hamamatsu datasheet.