RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2409026606 - Archived data from Wed, 03. February 2021 18:15:36 CET


This is all the information about APD 2409026606. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2409026606
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2409026606/2401025946
Unit: #874 (barcode 1309009671)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 13
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.3143143 V     T = -25 °C: 346.6815018 V
Voltage for Gain 150: T = +20 °C: 390.147091 V     T = -25 °C: 354.1387188 V
Voltage for Gain 200: T = +20 °C: 394.526163 V     T = -25 °C: 358.3135012 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.472242839 V-1     T = -25 °C: 5.000755057 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.837230864 V-1     T = -25 °C: 9.178385453 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.96973341 V-1     T = -25 °C: 14.52953658 V-1
Break-through voltage: T = +20 °C: 410.4931358 V     T = -25 °C: 373.9537451 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:27 CET jreher Updated box and position via API.
03. Feb 2021 18:15:36 CET jreher Updated box and position via API.
11. Aug 2020 17:21:55 CEST jreher Updated APD characteristics via API.
27. Mar 2020 11:32:38 CET jreher Assigned to capsule by script
13. Feb 2020 15:25:41 CET jreher Updated box and position via API.
27. Nov 2019 19:31:43 CET jreher Updated APD location via API.
25. Nov 2019 17:11:56 CET jreher Updated box and position via API.
04. Jul 2019 11:07:59 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:24 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:19 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:25 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:00 CET Tobias Corrected dark current unit.
26. Nov 2018 13:35:38 CET markus.moritz
16. Nov 2018 15:25:25 CET markus.moritz
12. Jan 2018 13:16:56 CET Tobias Imported from Hamamatsu datasheet.