RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2409026579 - Archived data from Tue, 11. August 2020 17:21:50 CEST


This is all the information about APD 2409026579. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2409026579
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 385.5 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 13
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 38 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.0187768 V     T = -25 °C: 349.3399143 V
Voltage for Gain 150: T = +20 °C: 392.8660289 V     T = -25 °C: 356.8239747 V
Voltage for Gain 200: T = +20 °C: 397.2149901 V     T = -25 °C: 361.0354105 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.644183385 V-1     T = -25 °C: 4.631928478 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.222567754 V-1     T = -25 °C: 9.091594272 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.50576331 V-1     T = -25 °C: 15.69858927 V-1
Break-through voltage: T = +20 °C: 412.9235753 V     T = -25 °C: 376.2966109 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:24 CET jreher Updated box and position via API.
03. Feb 2021 18:15:34 CET jreher Updated box and position via API.
11. Aug 2020 17:21:50 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:41 CET jreher Updated APD location via API.
25. Nov 2019 17:11:54 CET jreher Updated box and position via API.
04. Jul 2019 11:07:57 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:21 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:16 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:17 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:59 CET Tobias Corrected dark current unit.
26. Nov 2018 13:50:27 CET markus.moritz
16. Nov 2018 15:33:12 CET markus.moritz
12. Jan 2018 13:16:55 CET Tobias Imported from Hamamatsu datasheet.