RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2409026577 - Archived data from Tue, 11. August 2020 17:21:50 CEST


This is all the information about APD 2409026577. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2409026577
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2413026949/2409026577
Unit: #838 (barcode 1309009213)
Preamp: 4457
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 13
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0216785 V     T = -25 °C: 345.5609532 V
Voltage for Gain 150: T = +20 °C: 388.8142036 V     T = -25 °C: 352.9515192 V
Voltage for Gain 200: T = +20 °C: 393.1457165 V     T = -25 °C: 357.0920197 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.668401971 V-1     T = -25 °C: 4.959269018 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.296717401 V-1     T = -25 °C: 9.036184852 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.59276678 V-1     T = -25 °C: 15.56361163 V-1
Break-through voltage: T = +20 °C: 408.971696 V     T = -25 °C: 372.2899419 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:24 CET jreher Updated box and position via API.
03. Feb 2021 18:15:34 CET jreher Updated box and position via API.
11. Aug 2020 17:21:50 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:38 CET jreher Updated box and position via API.
27. Nov 2019 19:31:41 CET jreher Updated APD location via API.
25. Nov 2019 17:11:54 CET jreher Updated box and position via API.
15. Jul 2019 15:43:14 CEST jreher Assigned to unit by script
15. Jul 2019 15:19:41 CEST jreher Assigned to capsule by script
04. Jul 2019 11:07:57 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:21 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:16 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:17 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:59 CET Tobias Corrected dark current unit.
26. Nov 2018 13:55:47 CET markus.moritz
16. Nov 2018 15:33:54 CET markus.moritz
12. Jan 2018 13:16:55 CET Tobias Imported from Hamamatsu datasheet.