RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2408026546 - Archived data from Tue, 11. August 2020 17:21:48 CEST


This is all the information about APD 2408026546. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2408026546
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2408026546/2509028182
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 4 nA
   
Screening Logistics:  
Available: No
Storage Box: 12
Position in Box: 49
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9764946 V     T = -25 °C: 344.9713348 V
Voltage for Gain 150: T = +20 °C: 387.9302961 V     T = -25 °C: 352.3924802 V
Voltage for Gain 200: T = +20 °C: 392.3204843 V     T = -25 °C: 356.5873261 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.556247512 V-1     T = -25 °C: 4.69289405 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.333688675 V-1     T = -25 °C: 9.436244504 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.44944891 V-1     T = -25 °C: 16.07490023 V-1
Break-through voltage: T = +20 °C: 408.4213178 V     T = -25 °C: 372.2056144 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:20 CET jreher Updated box and position via API.
03. Feb 2021 18:15:30 CET jreher Updated box and position via API.
11. Aug 2020 17:21:48 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:22:04 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:42 CET jreher Updated box and position via API.
27. Nov 2019 19:31:33 CET jreher Updated APD location via API.
25. Nov 2019 17:11:52 CET jreher Updated box and position via API.
04. Jul 2019 11:07:52 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:20 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:15 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:10 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:59 CET Tobias Corrected dark current unit.
13. Dec 2018 13:48:45 CET markus.moritz
30. Nov 2018 08:33:41 CET markus.moritz
12. Jan 2018 13:16:55 CET Tobias Imported from Hamamatsu datasheet.