RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2408026542 - Archived data from Tue, 11. August 2020 17:21:47 CEST


This is all the information about APD 2408026542. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2408026542
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 12
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4185004 V     T = -25 °C: 345.0116236 V
Voltage for Gain 150: T = +20 °C: 388.2778482 V     T = -25 °C: 352.4101848 V
Voltage for Gain 200: T = +20 °C: 392.6762982 V     T = -25 °C: 356.5705317 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.453094864 V-1     T = -25 °C: 4.894806155 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.754655169 V-1     T = -25 °C: 8.984911589 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.97697401 V-1     T = -25 °C: 16.06013597 V-1
Break-through voltage: T = +20 °C: 408.3348682 V     T = -25 °C: 372.0634535 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:20 CET jreher Updated box and position via API.
03. Feb 2021 18:15:29 CET jreher Updated box and position via API.
07. Oct 2020 12:16:07 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:06 CEST jreher Updated box and position via API.
11. Aug 2020 17:21:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:33 CET jreher Updated APD location via API.
25. Nov 2019 17:11:52 CET jreher Updated box and position via API.
04. Jul 2019 11:07:52 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:20 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:15 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:10 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:59 CET Tobias Corrected dark current unit.
13. Dec 2018 13:51:04 CET markus.moritz
30. Nov 2018 08:34:56 CET markus.moritz
12. Jan 2018 13:16:55 CET Tobias Imported from Hamamatsu datasheet.