Show Hamamatsu Avalanche Photo Diode 2408026535 - Archived data from Tue, 11. August 2020 17:21:46 CEST


This is all the information about APD 2408026535. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2408026535
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 12
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.1176876 V     T = -25 °C: 346.8402838 V
Voltage for Gain 150: T = +20 °C: 390.0117444 V     T = -25 °C: 354.2650132 V
Voltage for Gain 200: T = +20 °C: 394.3902265 V     T = -25 °C: 358.4419629 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.499352093 V-1     T = -25 °C: 4.860874833 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.642260759 V-1     T = -25 °C: 9.135207147 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.94296405 V-1     T = -25 °C: 16.21504911 V-1
Break-through voltage: T = +20 °C: 409.7095078 V     T = -25 °C: 373.7373459 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:19 CET jreher Updated box and position via API.
03. Feb 2021 18:15:28 CET jreher Updated box and position via API.
11. Aug 2020 17:21:46 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:32 CET jreher Updated APD location via API.
25. Nov 2019 17:11:51 CET jreher Updated box and position via API.
04. Jul 2019 11:07:51 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:19 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:14 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:09 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:58 CET Tobias Corrected dark current unit.
13. Dec 2018 13:55:39 CET markus.moritz
30. Nov 2018 08:37:07 CET markus.moritz
12. Jan 2018 13:16:55 CET Tobias Imported from Hamamatsu datasheet.