RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2408026517 - Archived data from Tue, 11. August 2020 17:21:43 CEST


This is all the information about APD 2408026517. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2408026517
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2402026018/2408026517
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 12
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.1875701 V     T = -25 °C: 346.8691895 V
Voltage for Gain 150: T = +20 °C: 390.0512504 V     T = -25 °C: 354.2690375 V
Voltage for Gain 200: T = +20 °C: 394.4487343 V     T = -25 °C: 358.4385077 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.536428686 V-1     T = -25 °C: 4.950658489 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.914090728 V-1     T = -25 °C: 9.234720458 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.57263023 V-1     T = -25 °C: 14.46457873 V-1
Break-through voltage: T = +20 °C: 410.0342597 V     T = -25 °C: 373.7592905 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:18 CET jreher Updated box and position via API.
03. Feb 2021 18:15:27 CET jreher Updated box and position via API.
11. Aug 2020 17:21:43 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:15 CEST jreher Assigned to capsule by script
13. Feb 2020 14:22:29 CET jreher Updated box and position via API.
13. Feb 2020 14:22:17 CET jreher Updated box and position via API.
27. Nov 2019 19:31:31 CET jreher Updated APD location via API.
25. Nov 2019 17:11:50 CET jreher Updated box and position via API.
04. Jul 2019 11:07:50 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:18 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:13 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:02 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:58 CET Tobias Corrected dark current unit.
13. Dec 2018 14:02:57 CET markus.moritz
30. Nov 2018 08:44:32 CET markus.moritz
12. Jan 2018 13:16:54 CET Tobias Imported from Hamamatsu datasheet.